Back

Plug & Abandonment Packer

Plug & Abandonment Packer

IRI’s Inflatable Plug & Abandonment Combination is a good solution to properly plug and abandon wells that are no longer commercially viable. The P&A Combination is an inflatable bridge plug that is specifically built for today’s tough and challenging well environments. The Inflatable Plug & Abandonment Combination is a solid choice for Well Decommissioning and Permanent Zonal Isolation.

Contact Us
Features
  • One-piece mandrel
  • Available in various element lengths, materials, and threads
  • Complete P&A package
  • Modular design easily accommodates additional tools including Stage Tools, On/Off Tools, Check Valves, and Darts
Resources
IRI P&A Combination Package Includes: Bull Plug the bull plug is used to pressure up against and set the packer and isolates the string to create a permanent barrier) Abandonment Packer The abandonment packer would effectively create an annulus seal to isolate above and below the packer Hydraulic Disconnect the hydraulic disconnect is used to hydraulically disconnect from the plug and abandonment packer Pup Joint to handle BHA at Surface One Joint of Tubing to space out BHA Right Hand Release Disconnect Tool (redundancy release option to mechanically release from the BHA if hydraulic disconnect does not function. Six Right hand rotations to disconnect) Wye Sub (well control, allows the string to self-fill while running in hole. Can be circulated through in case well control is required)
Global Reach

Trusted Worldwide

IRI supports both offshore and onshore operations across multiple continents. Our reputation is built on responsiveness, reliability, and precision — qualities that major service providers rely on when failure is not an option.